Plumbing First Year

  • (check catalog for specific start dates)

  • First Quarter Begins September 12, 2011
    Commitment: 13 Weeks/72 Hours

    Students will thoroughly review construction site safety and shop safety and are introduced to trade mathematics; safe use of basic hand and power tools; blueprint reading; rigging; and are provided with an overview of plumbing careers, plumbing safety and plumbing math.

    Second Quarter Begins January 3, 2012
    Commitment: 12 Weeks/72 Hours

    Students are introduced to plumbing drawings; learn about plastic pipe and fittings; copper pipe and fittings; cast iron pipe and fittings; related 2009 Plumbing Code and WA Amendments.

    Third Quarter Begins March 26, 2012
    Commitment: 12 Weeks/72 Hours

    Students will learn about carbon steel pipe and fittings; fixtures and faucets; are introduced to drain, waste and venting (DWV) systems; and introduced to water distribution systems.

    Bellevue - Thursdays

    Tacoma - Thurdays

    Vancouver - Thursdays

    • Tuition: $922.00 each quarter
    • Required Books:
      • NCCER Core Curriculum 
      • NCCER Plumbing Level One 
      • NCCER "Your Role in the Green Environment".
      • 2006 Uniform Plumbing Code.